At Wuan Keli, EN 877 SML cast iron drainage pipes are finished on this automatic line.After coating, each pipe is marked and conveyed for inspection. Inside is the ochre epoxy lining; outside, a red-brown anti-corrosion coat.This pipe is DN 100 × 3 m, marked to EN 877 and GOST 6942-98 for the Russia
November 2026 — The core deployment of our Manufacturing Execution System (MES) Phase I is complete, and the project has now entered integration testing. It is not yet live.For a foundry, the difficulty with MES is never buying the software. It is getting the system onto the shop floor. The equipmen
See KELI’s factory hot zinc spray process for cast iron drainage pipes. Zinc coating weight stably reaches 130 g/m² with uniform adhesion, meeting EN 877 anticorrosion requirements.
This batch of EN877 drainage cast iron pipes for export has completed full finished-product inspection. Our QC team carries out batch testing on epoxy coating thickness, coating uniformity and dimensional accuracy. Products are approved for warehousing only after meeting all requirements of the EN877
Explore KELI cast iron drainage systems and EPAL box pallets. Select a product range for specifications, drawings and enquiry details.